China   English
SetHomePage
AddFavorite
AdminExtrance
DRY BULK L » Installation process

Installation process

bright century At2012-02-16 17:50Published
ClickCount 666Times

1. Place the folded container liner in a clean and sound container and unfold it .

2. Insert bar into sleeve and place it in the channels on the floor.
  转自:青岛蓝色世纪贸易有限公司(www.qingdaolssj.nev.cn)
3. Tie the rope and elastic circle securely to the hoops of container.

4. Tie the rope from bottom of liner at the door to the hoop on the floor to avoid movement when loading.

5. Install all four steel bars into door channels by putting bars through hanging loops and straps.
  转自:青岛蓝色世纪贸易有限公司(www.qingdaolssj.nev.cn)
6. Close the left door and inflate with air compressor to prepare to load cargoes.


Top Click Articles
Dry bulk li
Installatio
Application
What is a D

bright century container flexi tank|flexi container tank|qingdao bright century international trading co.,ltd| multi-purpose flexi tank|flexi tank
Office address:Room C,22nd floor, Haiya Building, Binghai Garden, No.1 shandong Road, Shinan District, Qingdao, China.
Factory address:Lancun town Industrial zone, Jimo city, Qingdao, China  Mobile:0086-18300243750
Tel:0086-532-85027708  Fax:0086-532-85027708  E-mail:brightcenturyqd@gmail.com
Site Management  中文  Visitors:
未经授权禁止抄袭、镜像本站. 如有违反,追究法律责任.  举报非法网站
Copyright ©2012 www.qingdaolssj.nev.cn & www.yuhou.com All Rights Reserved.